Description
This slide presentation begins with an outline of the City of Phoenix, Arizona’s Large Water Main Assessment Program. It outlines the city of Phoenix’s risk-managed approach to averting pre-stressed concrete cylinder pipe (PCCP) and covers topics that include: pipeline prioritization; elements of a risk assessment; likelihood factors ofinstallation date, waterway proximity and soil corrosivity; consequence factors ofpipeline diameter, adjacent land use, and proximity to railways and roadways; geographic information system (GIS)-Based Analysis; hydraulic modeling; Phoenix water model; demand, production, and evaluation of system impacts; and, PCCP Assessment Master Plan. Includes figures.
Product Details
- Edition:
- Vol. – No.
- Published:
- 03/01/2007
- Number of Pages:
- 28
- File Size:
- 1 file , 2.6 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus