AWWA MTC64634 PDF

$14.00

Impacts of Membrane Integrity Documentation Requirements on Multiple Stages of Membrane Implementation
Conference Proceeding by American Water Works Association, 03/01/2007

Document Format: PDF

Description

The City of Minneapolis membrane ultrafiltration program is in the unique position of starting up onefull-scale plant and procuring membranes for a second plant within the context of the draft Long Term 2Enhanced Surface Water Treatment Rule.Minneapolis procured the membranes for its first 70-MGD ultrafiltration plant in 2001. At that time,membranes were considered by the State of Minnesota to be an Alternative Filtration Technology. Basedon the results of the 7-month pilot testing program, the State of Minnesota granted the plant 4-logremoval for Cryptosporidium, Giardia, and viruses. A turbidity performance requirement was alsospecified by the State. As the project moved through construction in 2004, the State indicated theregulatory reporting requirements for the full scale plant should be consistent with the newly-issued DraftLong Term Enhanced Surface Water Treatment Rule and associated Membrane Filtration GuidanceManual. Through a team effort between the City, its consulting engineer, and the equipment supplier,requirements of the draft rule were successfully incorporated into the control and monitoring of the fullscaleplant.In 2004-2005, while the 70-MGD plant was moving through the final stages of construction intocommissioning and start-up, the City was procuring membranes for a second, 95-MGD membrane plant.The City focused on incorporating lessons learned from the actual implementation of the new regulatoryframework into the procurement of the membranes for its second plant.This paper discusses lessons learned when procuring, piloting, designing, andoperating membrane plants under the integrity requirements of the new rule. Details are presentedregarding what utilities and regulators should consider in preparing contract documents, what should bedemonstrated during pilot testing, and how to ensure accurate scale up and implementation in a full-scaleplant. Includes 2 references, figure.

Product Details

Edition:
Vol. – No.
Published:
03/01/2007
Number of Pages:
14
File Size:
1 file , 430 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus