Optimizing Existing Facilities
Conference Proceeding by American Water Works Association, 03/01/2005

Document Format: PDF

Description

This slide presentation outlines information on Cape Coral Utilities’ plan to optimize their existing treatment facilities to satisfy increasing water demand due to population growth in the area. Topics covered include: Cape Coral buildout schedule; two focuses of water demand growth that included an interim increase in capacity atthe existing plant of approximately2MGD, andparallel North Plant capacity of 12MGD(including bypass) required to beoperational in 2007; Cape Coral wellfields; projected water quality; existing plant descriptions; considered alternatives and impacts; blend stream; concentrate discharge; and, increasing existing plant capacity. Includes tables, figures.