Description
This article discusses how a comprehensive large-meter replacement program can help utilities avoid revenue losses caused by malfunctioning meters and increase reliability of service to customers. The following five phase program is outlined and discussed: phase 1 – create a large-meter database; phase 2 – perform field inspection of meter, and conduct customer site survey; phase 3 – prepare hydraulic calculations, and design meter setting; phase 4 – perform cost-benefit analysis and construction; and, phase 5 – update meter database and track meter performance. Includes 2 references, tables.
Product Details
- Edition:
- Vol. 90 – No. 8
- Published:
- 08/01/1998
- Number of Pages:
- 7
- File Size:
- 1 file , 760 KB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus