AWWA DSS69157 PDF

$14.00

Central Feeder Pipeline Project
Conference Proceeding by American Water Works Association, 11/01/2008

Document Format: PDF

Description

This powerpoint presentation begins by presenting study objectives that include the following:relieve areas of high groundwater; and,provide additional water supply to Metropolitan Water District of Southern California.The project required meeting the requirementsof two important regional clients, San Bernardino Valley Municipal Water District andMetropolitan Water District of Southern California. The overall project was implemented in a phasedapproach to meet Metropolitan’s growing demands, and several key issues were resolved duringpreliminary design related toproject water supply, hydraulics, andfacilities development. Final design and construction was divided into 4 tasks: Task 1 – Phase 1A Pipeline and Intertie Vaults;Task 2 – Phase 1B Pipeline;Task 3 – Pump Station Design; and,Task 4 – Pump Station Construction.

Product Details

Edition:
Vol. – No.
Published:
11/01/2008
Number of Pages:
37
File Size:
1 file , 4.3 MB
Note:
This product is unavailable in Ukraine, Russia, Belarus