AWWA DSS62063 PDF

$14.00

Incorporating Optimization into a Phased Water Master Plan
Conference Proceeding by American Water Works Association, 09/01/2005

Document Format: PDF

Description

This paper discusses the Water System Master Plan developed by the Butler County Department of Environmental Services (BCDES) in southwestern Ohio. The service area has been experiencing rapid growth, and BCDES faced unique operational and planning challenges. They currently purchase water from two different regionalsuppliers and are governed by contractual conditions with each supplier, includingminimum purchase requirements. There are three main supply connection points with thewater suppliers. Future improvements will add at least two more major supplyconnections to provide redundancy in the BCDES system and to enhance the suppliers’ability to deliver peak flows through flow splitting. Demand projections, distribution system analysis, optimization approach, and alternatives analysis are discussed. Includes 3 references, table, figure.

Product Details

Edition:
Vol. – No.
Published:
09/01/2005
Number of Pages:
9
File Size:
1 file , 290 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus