Description
A description of the Indian River County membrane softening plant, including operation and maintenance costs (energy, chemicals, membrane replacement, labor, plant utilization, blend rate), and construction costs are detailed in this paper.
Product Details
- Published:
- 01/01/1992
- ISBN(s):
- 0898676509
- Number of Pages:
- 20
- File Size:
- 1 file
- Note:
- This product is unavailable in Ukraine, Russia, Belarus