Description
This powerpoint presentation begins by providing a brief overview of the City of Thornton’s water supply and the selection of the treatment option of biological denitrification. The project overview includes: pilot testing of three biological processesfor the removal of nitrate as pretreatmentin drinking water; Water Research Foundation Project No. 4202, total project cost – $596K, theTailored Collaboration Program conducted a seven month pilot study;highest nitrate concentrations typicallyduring cold water conditions;influent nitrate spiked to ~10 mg/L NO<sub>3</sub>-N;goal of 80% nitrate removal (< 2 mg/L); and, methanol selected as preferred carbonsource for piloting. Pilot objectives were to: determine process performance in warm andcold water temperatures, specifically nitrate removal; determine design basis for full-scaleimplementation; evaluate startup and ability for intermittentoperation;optimize and evaluate operation; and, investigate effects of fluctuating raw waterconditions. Includes tables.
Product Details
- Edition:
- Vol. – No.
- Published:
- 11/01/2009
- Number of Pages:
- 26
- File Size:
- 1 file , 2 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus