AWWA ACE68916 PDF

$14.00

Pilot-Scale Evaluation and Design of a MIEX System for Compliance with the Stage 1 and 2 D&DBPRs for a Small System
Conference Proceeding by American Water Works Association, 11/01/2008

Document Format: PDF

Description

This study begins by providing a brief overview of the city of Carrabelle, Florida. Project objectives include the following: provide modular treatment units for ease offuture capacity expansion;provide the initial treatment system withsufficient capacity to treat the near termgrowth only, with initial installation;depend on modular nature of selectedtechnology to expand capacity whenrequired;treat water to resolve DBP complianceproblems and other regulatory requirementsof concern;defer treatment for aesthetic issues due tobudgetary constraints; maximize use of existing infrastructure;do not adversely impact the sanitary sewertransmission or treatment system withtreatment residuals;if technically and economically feasible,utilize the same treatment technology forboth systems; and,provide an operator-friendly system. Water quality and treatment goals are presented, along withalternatives analysis, pilot-study results, design considerations, andcurrent project status. Includes tables, figures.

Product Details

Edition:
Vol. – No.
Published:
11/01/2008
Number of Pages:
33
File Size:
1 file , 1 MB
Note:
This product is unavailable in Ukraine, Russia, Belarus