AWWA ACE61709 PDF

$14.00

Claremont Corridor Seismic Improvement Project
Conference Proceeding by American Water Works Association, 06/17/2005

Document Format: PDF

Description

This slide presentation outlines information on East Bay Municipal Utility District’s (EBMUD) project to upgrade the Claremont Water Supply Tunnel in order to maintain service after a moderate earthquake, and to maintain lifeline service after a magnitude 7.0 earthquake. The project overview included: 1,570-foot-long permanent bypass tunnel; repair and grout existing tunnel; 2-year period of construction; and, winter tunnel outages. Further topics covered include: extensive planning and preparations; outage planning and preparations; current WOH operations; tunnel outage WOH operations; example of water quality changes; customer impacts; design criteria; and, tunnel cross sections.

Product Details

Edition:
Vol. – No.
Published:
06/17/2005
Number of Pages:
40
File Size:
1 file , 6 MB
Note:
This product is unavailable in Ukraine, Russia, Belarus