Commissioning Of New Residuals Handling Facilities At a Direct Filtration Plant in Phoenix, Arizona
Conference Proceeding by American Water Works Association, 06/17/2005

Document Format: PDF

Description

This slide presentation outlines information on Phoenix, Arizona’s Union Hills WTP 160 MGDImprovements Project. The project was done in three phases: Phase 1 involvedrebuilding the existing 32 filters andconstructing 4 new 5 MGD filters; Phase 2 involved a raw water impoundment split; Phase 3a involved pretreatment facilities and Phase 3b involved an interim dewatering building. Further topics covered include: designcriteria for residuals handling; high turbidity events; comparing operational parameters; residuals parameters during high turbidity events; raw and settled tubidities; average turbidity and production; total organic carbon removals; centrifuge dewatering parametersduring high turbidity events; residuals parameters during high turbidity events; and, residuals contingency plans.

Product Details

Edition:
Vol. – No.
Published:
06/17/2005
Number of Pages:
39
File Size:
1 file , 2.1 MB
Note:
This product is unavailable in Ukraine, Russia, Belarus