Description
This slide presentation outlines information on comparing standard monitoring programs (SMP) and modeling system-specific studies (SSS) for Stage 2 DBP site selection. The objectives of this effort were to: determine sites as if SMP (every 60 days);determine sites as if SSS (one sampling);determine “true” sites (monthly monitoring); and, compare results of SSS and SMP. Topics covered include: Greater Cincinnati Water Works (GCWW) system overview; model requirements for initial distribution system evaluation (IDSE); selecting potential Stage 2B Sites; and, performing the IDSE – SSS: using sample data.
Product Details
- Edition:
- Vol. – No.
- Published:
- 06/17/2004
- Number of Pages:
- 32
- File Size:
- 1 file , 7.8 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus