AWWA ACE95158 PDF

$14.00

Bidding of Alternative Designs for Large Water Storage Reservoirs
Conference Proceeding by American Water Works Association, 01/01/1995

Document Format: PDF

Description

The City of Beaverton embarked on a major water system improvement program that included four major components. The program was to satisfy the increasing water demands for both domestic consumption and fire protection in a growing city. The largest project was a 15 million gallon reservoir and pump station. Because of the City’s excellent bond rating, Beaverton determined that the most feasible method of funding those improvements was the sale of water revenue bonds. The City was committed to completing these four projects within the bond amount and was willing to consider suggestions on possible ways to construct these projects in the most cost effective manner. The bidding of alternative designs for the large reservoir proved to be an effective method to meet this objective.

Product Details

Published:
01/01/1995
ISBN(s):
0898678358
Number of Pages:
16
File Size:
1 file
Note:
This product is unavailable in Ukraine, Russia, Belarus